Publication: Technical and economic evaluation of energy production from wind in İstanbul and surrounds
Date
Authors
Authors
Vardar, Ali
Taşkın, Onur
Advisor
Language
Type
Publisher:
University of Cape Town
Journal Title
Journal ISSN
Volume Title
Abstract
Istanbul is located in the northwest part of Turkey and has the greatest population of any city in the country. Istanbul and its surroundings were researched for wind potential. Energy production from wind was evaluated technically and economically in this study. Çorlu, Kumköy and Sile sites were examined. Other sites in the same region (Göztepe, Kireçburnu, Bahçeköy, Florya and Kartal) were also evaluated but the results were not satisfactory, and for this reason, these sites were not examined in this study. When we checked daily, monthly and yearly wind speed values and frequency distributions, the wind energy potential of Çorlu, Kumköy and Sile were greater than other sites. Çorlu, Kumköy and especially Sile's wind speed data are statistically decreasing. A Nordex N117 91m hub height wind turbine can produce 6099 MWh in Çorlu, 6459 MWh in Sile, 7265 MWh in Kumköy. A Nordex N117 140 m hub height wind turbine can produce 6471 MWh in Çorlu, 7439 MWh in Sile and 8175 MWh in Kumköy. The energy costs were calculated by the average of 36 years of wind measurement data using Nordex N117 turbines. Energy costs with Nordex N117 91 m and 140 m hub height inÇorlu, Sile and Kumköy are 0.025-0,027 US$/KWh, 0.022-0,025 US$/KWh, 0.020-0,023 US$/KWh, respectively.
Description
Source:
Keywords:
Keywords
Wind potential, Pay-back period, Energy production, Energy cost